2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
  • Load image into Gallery viewer, 2 Color Retractable Dual Double Pet Leash Rope  Walk For Dog  Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat

Vendor
Stevvex
Regular price
Rs. 2,109.69
Sale price
Rs. 2,109.69
Regular price
Rs. 5,276.63
Sold out
Unit price
per 
Shipping calculated at checkout.

 Description:

  • DURABILITY AND SAFETY- This dog training leash is made of sturdy nylon, which is durable and perfectly protects your dog. Chrome-plated hooks enhance 360° rotation at the joint.
  • COMFORTABLE HANDLE-  The ergonomic non-slip handle is easy to grasp and provides a pleasant walking experience for your pet, without worrying that the dog leash will hurt your hand.
  • EASY TO USE- Quick lock, pause and unlock buttons-easy to operate with your thumb. No tangles, it is very suitable for walking, jogging, running, camping and hiking, or going out for a leisurely stroll in the backyard.

Brand Name: STEVVEX Pets
Model Number: ST12DB767QWS

Type: Leashes
Dog Leash Type: Double Leashes
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: LIGHTS